Five-Year Project List

Abbreviations and Codes

This document uses the following abbreviations and codes throughout the project tables. Use this glossary as a reference while reading.

General Abbreviations

ALOP
Annual Listing of Obligated Projects
BCT
Broward County Transit
CFP
Cost Feasible Plan
CMAQ
Congestion Mitigation and Air Quality Improvement Program
CMP
Congestion Management Process
EMO
Environmental Management Office
FDOT
Florida Department of Transportation
FHWA
Federal Highway Administration
FLP
Freight, Logistics and Passenger
FM#
Financial Management Number
FRA
Federal Railroad Administration
FTA
Federal Transit Administration
ICWW
Intracoastal Waterway
IIJA
Infrastructure Investment and Jobs Act
ITS
Intelligent Transportation Systems
LOPP
List of Priority Projects
LRTP
Long Range Transportation Plan
MPO
Metropolitan Planning Organization
MTP
Metropolitan Transportation Plan
PD&E
Project Development and Environment
PM1
Performance Measure 1 (Safety)
PM2
Performance Measure 2 (Pavement and Bridge)
PM3
Performance Measure 3 (System Performance)
REV
Roads for Economic Vitality
RFF
Roads for Families
SEFTC
Southeast Florida Transportation Council
SFRTA
South Florida Regional Transportation Authority
SIS
Strategic Intermodal System
TAM
Transit Asset Management
TIP
Transportation Improvement Program
TMA
Transportation Management Area
USC
United States Code
UZA
Urbanized Area
YOE
Year of Expenditure

Phase Codes

CEI
Construction Engineering and Inspection
CST
Construction
ENG
Engineering
ENV
Environmental
INC
Construction Incentive
OPS
Operations
PDE
Project Development and Environment
PE
Preliminary Engineering
ROW
Right-of-Way

Fund Source Codes

ACNP
Advance Construction NHPP
ACSS
Advance Construction Surface Transportation Block Grant
BRRP
Bridge Rehabilitation/Replacement Program
DDR
District Dedicated Revenue
DIH
State In-House Product Support
DS
State Primary
DSPC
State Primary Construction
LF
Local Funds
SU
STBG Urban Areas
TALT
Transportation Alternatives Any Area
TALU
Transportation Alternatives Urban
TOBD
TO Block Grant - SU
TOBF
Transit Operating Block Funds

Highways

FM# 4363394 — BROWARD COUNTY PUSH BUTTON CONTRACT TRAFFIC SIGNAL CONST

Type of Work
TRAFFIC CONTROL DEVICES/SYSTEM
Length
0.0 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
TI166
FM# 4363394">
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTDDR$1,738,309$0$0$0$0$1,738,309
CSTDIH$174,760$0$0$0$0$174,760
Total$1,913,069$0$0$0$0$1,913,069

Total Project Cost: $1,913,069 (incl. prior + future years)

FM# 4363395 — BROWARD COUNTY PUSH BUTTON CONTRACT TRAFFIC SIGNAL CONST

Type of Work
TRAFFIC CONTROL DEVICES/SYSTEM
Length
0.0 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
TI167
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTDDR$0$0$2,083,783$0$0$2,083,783
CSTDIH$0$0$95,720$0$0$95,720
Total$0$0$2,179,503$0$0$2,179,503

Total Project Cost: $2,179,503 (incl. prior + future years)

FM# 4363396 — BROWARD COUNTY PUSH-BUTTON CONTRACT TRAFFIC SIGNAL CONST

Type of Work
TRAFFIC CONTROL DEVICES/SYSTEM
Length
0.0 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
PG112
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTDDR$0$0$0$0$2,292,069$2,292,069
CSTDIH$0$0$0$0$98,515$98,515
Total$0$0$0$0$2,390,584$2,390,584

Total Project Cost: $2,390,584 (incl. prior + future years)

FM# 4292498 — BROWARD COUNTY PUSH-BUTTON TRAFFIC OPS - ROADWAY

Type of Work
MISCELLANEOUS CONSTRUCTION
Length
0.0 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
PG112
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTDDR$0$0$0$0$2,292,069$2,292,069
CSTDIH$0$0$0$0$98,515$98,515
Total$0$0$0$0$2,390,584$2,390,584

Total Project Cost: $2,390,584 (incl. prior + future years)

FM# 2317236 — BROWARD COUNTY ROAD RANGER SERVICE PATROL

Type of Work
SERVICE PATROL/FHP
Length
0.0 miles (SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
PG112
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
OPSTOBD$210,000$0$0$0$0$210,000
OPSDSPC$766,114$0$0$0$0$766,114
Total$976,114$0$0$0$0$976,114

Total Project Cost: $32,464,679 (incl. prior + future years)

FM# 2317237 — BROWARD COUNTY ROAD RANGER SERVICE PATROL

Type of Work
SERVICE PATROL/FHP
Length
0.0 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
PG112
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
OPSDDR$0$0$0$0$222,756$222,756
OPSTOBD$0$0$0$229,326$0$229,326
OPSDSPC$0$2,194,920$6,208,677$7,784,674$5,435,200$21,623,471
OPSTO02$0$0$0$0$236,894$236,894
Total$0$2,194,920$6,208,677$8,014,000$5,894,850$22,312,447

Total Project Cost: $22,312,447 (incl. prior + future years)

FM# 4162573 — BROWARD ITS FACILITY OPERATIONS AND MAINTENANCE JPA

Type of Work
ITS FREEWAY MANAGEMENT
Length
0.0 miles (Non-SIS)
Lead Agency
Responsible Agency Not Available
MTP ID
PG268
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
OPSDDR$804,780$1,002,800$700,194$721,200$724,836$3,953,810
Total$804,780$1,002,800$700,194$721,200$724,836$3,953,810

Total Project Cost: $6,191,684 (incl. prior + future years)

FM# 4455291 — CITY OF DEERFIELD BEACH VARIOUS LOCATIONS

Type of Work
BIKE LANE/SIDEWALK
Length
1.626 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF DEERFIELD BEACH
MTP ID
TI357
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTSU$0$1,411,194$0$0$0$1,411,194
CSTTALT$0$1,000,000$0$0$0$1,000,000
Total$0$2,411,194$0$0$0$2,411,194

Total Project Cost: $3,023,993 (incl. prior + future years)

FM# 4455341 — CITY OF HOLLYWOOD - VARIOUS LOCATIONS

Type of Work
SIDEWALK
Length
5.991 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF HOLLYWOOD
MTP ID
TI361
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTTALU$0$1,666,410$0$0$0$1,666,410
Total$0$1,666,410$0$0$0$1,666,410

Total Project Cost: $1,948,312 (incl. prior + future years)

FM# 4533391 — CITY OF HOLLYWOOD SIDEWALK AT VARIOUS LOCATIONS

Type of Work
BIKE PATH/TRAIL
Length
11.194 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF HOLLYWOOD
MTP ID
TI381
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTLF$0$0$0$0$298,655$298,655
CSTSU$0$0$0$0$3,529,127$3,529,127
PESU$0$452,982$0$0$0$452,982
Total$0$452,982$0$0$3,827,782$4,280,764

Total Project Cost: $4,280,764 (incl. prior + future years)

FM# 4439511 — CITY OF LAUDERDALE LAKES TRAFFIC CALMING VARIOUS LOCATIONS

Type of Work
MISCELLANEOUS CONSTRUCTION
Length
3.65 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF LAUDERDALE LAKES
MTP ID
TI350
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTLF$117,420$0$0$0$0$117,420
CSTSU$1,457,339$0$0$0$0$1,457,339
Total$1,574,759$0$0$0$0$1,574,759

Total Project Cost: $2,022,007 (incl. prior + future years)

FM# 4507831 — CITY OF LAUDERHILL VARIOUS LOCATIONS

Type of Work
BIKE LANE/SIDEWALK
Length
2.328 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF LAUDERHILL
MTP ID
TI374
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTLF$0$0$0$0$399,910$399,910
CSTTALU$0$0$0$0$968,801$968,801
PESU$0$150,190$0$0$0$150,190
Total$0$150,190$0$0$1,368,711$1,518,901

Total Project Cost: $1,518,901 (incl. prior + future years)

FM# 4439771 — CITY OF MIRAMAR VARIOUS LOCATIONS

Type of Work
SIDEWALK
Length
1.376 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF MIRAMAR
MTP ID
TI352
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTSU$1,254,706$0$0$0$0$1,254,706
Total$1,254,706$0$0$0$0$1,254,706

Total Project Cost: $1,635,167 (incl. prior + future years)

FM# 4482881 — CITY OF WESTON VARIOUS LOCATIONS

Type of Work
SIDEWALK
Length
1.51 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF WESTON
MTP ID
TI307
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTLF$0$0$0$1,480,475$0$1,480,475
CSTSU$0$0$0$3,139,414$0$3,139,414
PESU$787,881$0$0$0$0$787,881
Total$787,881$0$0$4,619,889$0$5,407,770

Total Project Cost: $5,410,270 (incl. prior + future years)

FM# 4497161 — CITYWIDE SIDEWALK IMPROVEMENTS IN LAUDERDALE LAKES

Type of Work
SIDEWALK
Length
0.0 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF LAUDERDALE LAKES
MTP ID
TI371
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTSU$0$0$0$110,889$0$110,889
CSTTALU$0$0$0$891,346$0$891,346
PESU$303,390$0$0$0$0$303,390
Total$303,390$0$0$1,002,235$0$1,305,625

Total Project Cost: $1,308,125 (incl. prior + future years)

FM# 4496781 — CLEARY BLVD FROM HIATUS RD TO UNIVERSITY DR

Type of Work
TRAFFIC SIGNALS
Length
2.7 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF PLANTATION
MTP ID
TI369
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTSU$0$502,500$0$0$0$502,500
Total$0$502,500$0$0$0$502,500

Total Project Cost: $502,500 (incl. prior + future years)

FM# 4417132 — COPANS ROAD GRADE SEPARATION @ SOUTH FLORIDA RAIL CORRIDOR

Type of Work
PD&E/EMO STUDY
Length
0.0 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
PG114
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
PDEDDR$0$500,000$0$0$0$500,000
Total$0$500,000$0$0$0$500,000

Total Project Cost: $500,000 (incl. prior + future years)

FM# 4492431 — COUNTYWIDE SONOVOID SLAB BRIDGE REHABILITATION

Type of Work
BRIDGE-REPAIR/REHABILITATION
Length
0.04 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
PG268
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTBRRP$2,756,353$0$0$0$0$2,756,353
CSTDIH$26,046$0$0$0$0$26,046
Total$2,782,399$0$0$0$0$2,782,399

Total Project Cost: $4,108,407 (incl. prior + future years)

FM# 4492432 — COUNTYWIDE SONOVOID SLAB BRIDGE REHABILITATION

Type of Work
BRIDGE-REPAIR/REHABILITATION
Length
0.061 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
PG268
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTBRRP$0$0$0$3,927,121$0$3,927,121
CSTDIH$0$0$0$64,197$0$64,197
Total$0$0$0$3,991,318$0$3,991,318

Total Project Cost: $3,991,318 (incl. prior + future years)

FM# 4492433 — COUNTYWIDE SONOVOID SLAB BRIDGE REHABILITATION

Type of Work
BRIDGE-REPAIR/REHABILITATION
Length
9.717 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
PG268
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTBRRP$0$0$0$4,929,408$0$4,929,408
CSTDIH$0$0$0$67,920$0$67,920
Total$0$0$0$4,997,328$0$4,997,328

Total Project Cost: $4,997,328 (incl. prior + future years)

FM# 4508311 — CR-816/OAKLAND PARK BLVD FROM HIATUS GREENWAY TO CR-817/UNIVERSITY DR

Type of Work
BIKE LANE/SIDEWALK
Length
2.64 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF SUNRISE
MTP ID
TI376
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
PESU$0$1,399,000$0$0$0$1,399,000
Total$0$1,399,000$0$0$0$1,399,000

Total Project Cost: $1,399,000 (incl. prior + future years)

FM# 4531551 — DISTRICTWIDE ADVANCED WRONG WAY DRIVING DETECTION SYSTEM

Type of Work
ITS COMMUNICATION SYSTEM
Length
4.761 miles (SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
TI406
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTDDR$0$0$1,983,134$0$0$1,983,134
CSTACSS$0$0$4,666,789$0$0$4,666,789
Total$0$0$6,649,923$0$0$6,649,923

Total Project Cost: $7,558,493 (incl. prior + future years)

FM# 4533251 — E ORANGE DRIVE FROM DAVIE ROAD TO SR-7

Type of Work
FEASIBILITY STUDY
Length
1.762 miles (Non-SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
TI378
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
PDESU$0$0$0$805,000$0$805,000
Total$0$0$0$805,000$0$805,000

Total Project Cost: $805,000 (incl. prior + future years)

FM# 4554341 — GUARDRAIL INSTALLATION SEVERAL LOCATIONS ALONG I-75/ALLIGATOR ALLEY

Type of Work
GUARDRAIL
Length
44.373 miles (SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
PG112
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTDDR$0$2,640,985$0$0$0$2,640,985
CSTDIH$0$43,960$45,368$0$0$89,328
CSTDS$0$82,425$0$0$0$82,425
CSTDSB2$0$3,678,262$0$0$0$3,678,262
PEDEM$0$700,000$0$0$0$700,000
Total$0$7,145,632$45,368$0$0$7,191,000

Total Project Cost: $7,296,000 (incl. prior + future years)

FM# 4482901 — HONEY HILL DR FROM FLAMINGO RD TO SW 55 ST

Type of Work
BIKE PATH/TRAIL
Length
0.866 miles (Non-SIS)
Lead Agency
MANAGED BY CITY OF MIRAMAR
MTP ID
TI308
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
CSTLF$0$0$0$141,758$0$141,758
CSTTALT$0$0$0$736,304$0$736,304
PESU$309,822$0$0$0$0$309,822
Total$309,822$0$0$878,062$0$1,187,884

Total Project Cost: $1,190,384 (incl. prior + future years)

FM# 4456731 — I-595 EASTBOUND TO NORTHBOUND RAMP AT SR-7/US-441

Type of Work
INTERCHANGE - ADD LANES
Length
1.784 miles (SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
SI013
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
INCACNP$0$150,000$0$0$0$150,000
Total$0$150,000$0$0$0$150,000

Total Project Cost: $4,945,558 (incl. prior + future years)

FM# 4335791 — I-595 EXPRESS LANES TOLL OPERATIONS

Type of Work
TOLL COLLECTION
Length
0.0 miles (SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
TI390
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
OPSTOBF$515,300$529,700$546,220$565,000$571,000$2,727,220
Total$515,300$529,700$546,220$565,000$571,000$2,727,220

Total Project Cost: $6,191,965 (incl. prior + future years)

FM# 4208093 — I-595/SR-862/ P3 FROM E. OF I-75 TO W. OF I-95

Type of Work
ADD LANES & RECONSTRUCT
Length
9.815 miles (SIS)
Lead Agency
MANAGED BY FDOT
MTP ID
SI038
Funding by phase, fund source, and fiscal year
PhaseFund SourceFY 2026FY 2027FY 2028FY 2029FY 2030Total
OPSD$1,394,199$1,449,967$1,507,966$1,568,285$1,631,016$7,551,433
OPSDDR$14,630,259$14,989,336$16,775,824$17,999,562$18,133,006$82,527,987
OPSDI$1,873,031$1,897,039$1,921,708$947,055

Highways

FM# 4492571 — SR-842/LAS OLAS BLVD OVER ICWW

Type of Work
BRIDGE-REPAIR/REHABILITATION
Length
0.207 miles
Lead Agency
MANAGED BY FDOT
MTP ID
PG268
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DIH $118,036 $0 $0 $0 $0 $118,036
INC BRRP $0 $180,000 $0 $0 $0 $180,000
Total $118,036 $180,000 $0 $0 $0 $298,036

Total Project Cost: $17,068,781 (incl. prior + future years)

FM# 4461962 — SR-845 POWERLINE RD FR N OF S PALM AIRE DR TO SR-814/ATL BLVD

Type of Work
RESURFACING
Length
0.892 miles
Lead Agency
MANAGED BY FDOT
MTP ID
TI182
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $0 $0 $1,140,331 $0 $0 $1,140,331
CST DIH $0 $0 $174,900 $0 $0 $174,900
CST SA $0 $0 $271,877 $0 $0 $271,877
CST ACNR $0 $0 $482,090 $0 $0 $482,090
Total $0 $0 $2,069,198 $0 $0 $2,069,198

Total Project Cost: $2,069,198 (incl. prior + future years)

FM# 4463781 — SR-845/POWERLINE RD FROM SW 10TH ST TO BROWARD/PALM BEACH COUNTY LINE

Type of Work
PD&E/EMO STUDY
Length
1.495 miles
Lead Agency
MANAGED BY FDOT
MTP ID
TI184
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PDE DDR $0 $0 $0 $500,000 $500,000 $1,000,000
PDE DIH $0 $0 $0 $40,000 $0 $40,000
Total $0 $0 $0 $540,000 $500,000 $1,040,000

Total Project Cost: $1,040,000 (incl. prior + future years)

FM# 4484061 — SR-845/POWERLINE ROAD FROM ATLANTIC BLVD TO NW 30TH PLACE

Type of Work
RESURFACING
Length
2.623 miles
Lead Agency
MANAGED BY FDOT
MTP ID
PG268
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $0 $0 $6,653,435 $0 $0 $6,653,435
CST DIH $0 $0 $88,573 $0 $0 $88,573
CST ACNR $0 $0 $1,631,723 $0 $0 $1,631,723
Total $0 $0 $8,373,731 $0 $0 $8,373,731

Total Project Cost: $9,475,145 (incl. prior + future years)

FM# 4495651 — SR-858/HALLANDALE BEACH BLVD @ NE 14 AVE

Type of Work
ADD LEFT TURN LANE(S)
Length
4.47 miles
Lead Agency
MANAGED BY FDOT
MTP ID
TI206
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE DDR $0 $0 $0 $360,000 $0 $360,000
PE DIH $0 $0 $0 $10,000 $0 $10,000
PDE DDR $0 $75,000 $0 $0 $0 $75,000
Total $0 $75,000 $0 $370,000 $0 $445,000

Total Project Cost: $445,000 (incl. prior + future years)

FM# 4475481 — SR-858/HALLANDALE BEACH BLVD FR E OF SR-7/441 TO SW 44TH AVENUE

Type of Work
LIGHTING
Length
1.212 miles
Lead Agency
MANAGED BY FDOT
MTP ID
TI044
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST ACSS $380,478 $0 $0 $0 $0 $380,478
Total $380,478 $0 $0 $0 $0 $380,478

Total Project Cost: $794,863 (incl. prior + future years)

FM# 4398911 — SR-869/SW 10TH ST FROM FL TURNPIKE/SAWGRASS EXPRESSWAY TO W OF I-95

Type of Work
INTERCHANGE IMPROVEMENT
Length
2.995 miles
Lead Agency
MANAGED BY FDOT
MTP ID
TI017
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
DSB ACNP $1,457,349 $334,000 $333,000 $0 $0 $2,124,349
Total $1,457,349 $334,000 $333,000 $0 $0 $2,124,349

Total Project Cost: $276,101,706 (incl. prior + future years)

FM# 4398912 — SR-869/SW 10TH STREET FROM SR-845/POWERLINE ROAD TO MILITARY TRAIL

Type of Work
LANDSCAPING
Length
1.443 miles
Lead Agency
MANAGED BY FDOT
MTP ID
PG112
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE DDR $0 $0 $0 $539,976 $0 $539,976
PE DIH $0 $0 $0 $20,000 $0 $20,000
Total $0 $0 $0 $559,976 $0 $559,976

Total Project Cost: $5,534,976 (incl. prior + future years)

FM# 4458911 — SR-870/COMMERCIAL BLVD BRIDGE OVER ICWW

Type of Work
BRIDGE-REPAIR/REHABILITATION
Length
0.114 miles
Lead Agency
MANAGED BY FDOT
MTP ID
TI055
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST BRRP $0 $8,251,883 $0 $0 $0 $8,251,883
CST DDR $0 $1,829,163 $0 $0 $0 $1,829,163
CST DIH $0 $130,923 $0 $0 $0 $130,923
Total $0 $10,211,969 $0 $0 $0 $10,211,969

Total Project Cost: $13,831,946 (incl. prior + future years)

FM# 4484081 — SR-870/COMMERCIAL BLVD FR SW 31ST AVE TO WEST OF SR-845/POWERLINE ROAD

Type of Work
RESURFACING
Length
2.002 miles
Lead Agency
MANAGED BY FDOT
MTP ID
PG268
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $0 $0 $0 $828,766 $0 $828,766
CST DIH $0 $0 $0 $72,885 $0 $72,885
CST LF $0 $0 $0 $68,880 $0 $68,880
CST ACSS $0 $0 $0 $2,442,638 $0 $2,442,638
CST ACNR $0 $0 $0 $5,103,195 $0 $5,103,195
CST ACPR $0 $0 $0 $231,574 $0 $231,574
PE DDR $0 $820,996 $0 $0 $0 $820,996
Total $0 $820,996 $0 $8,747,938 $0 $9,568,934

Total Project Cost: $10,212,414 (incl. prior + future years)

FM# 4547771 — SR-870/COMMERCIAL BLVD FR UNIVERSITY DR TO W. OF ROCK ISLAND ROAD

Type of Work
TRAFFIC SIGNAL UPDATE
Length
2.001 miles
Lead Agency
MANAGED BY FDOT
MTP ID
PG112
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE DDR $0 $0 $0 $0 $400,000 $400,000
PE DIH $0 $0 $0 $0 $10,000 $10,000
Total $0 $0 $0 $0 $410,000 $410,000

Total Project Cost: $410,000 (incl. prior + future years)

FM# 4547721 — SR-870/COMMERCIAL BOULEVARD GRADE CROSSING REHABILITATION SFRC

Type of Work
RAIL REVENUE/OPERATIONA IMPR
Length
2.846 miles
Lead Agency
MANAGED BY FDOT
MTP ID
PG114
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
RRU DDR $1,000,000 $0 $0 $0 $0 $1,000,000
Total $1,000,000 $0 $0 $0 $0 $1,000,000

Total Project Cost: $1,172,027 (incl. prior + future years)

FM# 4358087 — SR-9/I-95 @ FROM N OF COMMERCIAL BLVD. TO N OF CYPRESS CREEK ROAD

Type of Work
INTERCHANGE - ADD LANES
Length
2.559 miles
Lead Agency
MANAGED BY FDOT
MTP ID
SI020
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST ACNP $0 $0 $0 $0 $44,551,707 $44,551,707
RRU ACNP $0 $0 $0 $3,934,000 $0 $3,934,000
Total $0 $0 $0 $3,934,000 $44,551,707 $48,485,707

Total Project Cost: $49,077,485 (incl. prior + future years)

FM# 4355131 — SR-9/I-95 @ SR-842/BROWARD BOULEVARD

Type of Work
INTERCHANGE - ADD LANES
Length
4.778 miles
Lead Agency
MANAGED BY FDOT
MTP ID
SI001
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
ROW DDR $440,000 $300,000 $165,000 $0 $0 $905,000
ROW DIH $72,000 $0 $0 $0 $0 $72,000
ROW ACNP $0 $597,970 $0 $500,000 $5,027,309 $6,125,279
ROW BNIR $7,151,576 $0 $0 $0 $0 $7,151,576
ROW DSBG $3,093,150 $0 $0 $0 $1,207,850 $4,301,000
Total $10,756,726 $897,970 $165,000 $500,000 $6,235,159 $18,554,855

Total Project Cost: $56,720,859 (incl. prior + future years)

FM# 4355141 — SR-9/I-95 @ SUNRISE BLVD. INTERCHANGE IMPROVEMENT

Type of Work
INTERCHANGE - ADD LANES
Length
1.543 miles
Lead Agency
MANAGED BY FDOT
MTP ID
SI002
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST ACNP $117,317 $0 $0 $0 $0 $117,317
INC SA $0 $0 $690,000 $0 $0 $690,000
Total $117,317 $0 $690,000 $0 $0 $807,317

Total Project Cost: $69,340,070 (incl. prior + future years)

FM# 4358083 — SR-9/I-95 E OF 95 RAMPS T/FR COMMERCIAL BLVD N ANDREWS AV FRONTAGE RD

Type of Work
ADD LANES & RECONSTRUCT
Length
1.549 miles
Lead Agency
MANAGED BY FDOT
MTP ID
SI004
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
ROW DDR $4,298,907 $73,610 $0 $0 $0 $4,372,517
ROW DIH $114,430 $0 $0 $0 $0 $114,430
ROW ACNP $286,320 $0 $0 $0 $0 $286,320
RRU DDR $96,000 $0 $0 $0 $0 $96,000
Total $4,795,657 $73,610 $0 $0 $0 $4,869,267

Total Project Cost: $35,450,647 (incl. prior + future years)

FM# 4391701 — SR-9/I-95 FROM MIAMI-DADE/BROWARD COUNTY LINE TO NORTH OF GRIFFIN ROAD

Type of Work
INTERCHANGE JUSTIFICA/MODIFICA
Length
13.183 miles
Lead Agency
MANAGED BY FDOT
MTP ID
SI022
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
ENV ACNP $0 $20,000 $0 $0 $0 $20,000
Total $0 $20,000 $0 $0 $0 $20,000

Total Project Cost: $94,641,528 (incl. prior + future years)

FM# 4391703 — SR-9/I-95 FROM N OF SR-820/HOLLYWOOD TO N OF SR-822/ SHERIDAN ST

Type of Work
INTERCHANGE JUSTIFICA/MODIFICA
Length
0.0 miles
Lead Agency
MANAGED BY FDOT
MTP ID
SI006
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE ACNP $0 $8,010,000 $0 $0 $0 $8,010,000
Total $0 $8,010,000 $0 $0 $0 $8,010,000

Total Project Cost: $8,010,000 (incl. prior + future years)

FM# 4358082 — SR-9/I-95 FROM S OF COMMERCIAL BLVD. TO CYPRESS CREEK ROAD

Type of Work
INTERCHANGE - ADD LANES
Length
3.468 miles
Lead Agency
MANAGED BY FDOT
MTP ID
SI007
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
RRU ACNP $0 $0 $0 $0 $60,000 $60,000
Total $0 $0 $0 $0 $60,000 $60,000

Total Project Cost: $77,779,852 (incl. prior + future years)

FM# 4093544 — SR-9/I-95 FROM S OF SR-820/HOLLYWOOD BLVD TO DAVIE BLVD

Type of Work
LANDSCAPING
Length
7.84 miles
Lead Agency
MANAGED BY FDOT
MTP ID
PG112
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $3,407,216 $0 $0 $0 $0 $3,407,216
CST DIH $119,777 $0 $0 $0 $0 $119,777
Total $3,526,993 $0 $0 $0 $0 $3,526,993

Total Project Cost: $4,136,772 (incl. prior + future years)

FM# 4369643 — SR-9/I-95 FROM S OF SR-869 / SW 10TH STREET TO BROWARD/PALM BEACH CL

Type of Work
LANDSCAPING
Length
2.334 miles
Lead Agency
MANAGED BY FDOT
MTP ID
PG112
SIS
SIS

Rail

FM# 4521751 — SFRC - OVERPASS FEASIBILITY STUDIES AT VARIOUS LOCATIONS

Type of Work
PTO STUDIES
Length
0.0 miles
SIS
SIS
MTP ID
TI427
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE DDR $0 $0 $0 $249,792 $0 $249,792
PE DIH $0 $0 $0 $39,966 $0
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PDE DIS $1,332,850 $0 $0 $0 $0 $1,332,850
Total $1,332,850 $0 $0 $0 $0 $1,332,850

Total Project Cost: $1,332,850 (incl. prior + future years)

FM# 4374541 — SFRC FLAGGING AND EMERGENCY SERVICES

Type of Work
RAIL PRESERVATION PROJECT
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG114
Lead Agency
MANAGED BY FDOT

EMERGENCY "FLAGGING" ON THE SOUTH FLORIDA RAIL CORRIDOR

Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
RRU DPTO $800,000 $200,000 $511,850 $1,500,000 $1,500,000 $4,511,850
RRU TRIP $0 $600,000 $1,088,150 $1,000,000 $0 $2,688,150
Total $800,000 $800,000 $1,600,000 $2,500,000 $1,500,000 $7,200,000

Total Project Cost: $11,427,490 (incl. prior + future years)

FM# 4505722 — SOUTH FLORIDA RAIL CORRIDOR - NW 25TH ST. TO 964 CUT/DAX TO MILITARY

Type of Work
RAIL SAFETY PROJECT
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG114
Lead Agency
MANAGED BY SFRTA
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $5,250,000 $0 $0 $0 $0 $5,250,000
CAP LF $5,250,000 $0 $0 $0 $0 $5,250,000
Total $10,500,000 $0 $0 $0 $0 $10,500,000

Total Project Cost: $11,140,000 (incl. prior + future years)

FM# 4547541 — SR-84 AT FLORIDA EAST COAST CORRIDOR CROSSING PD&E STUDY

Type of Work
PTO STUDIES
Length
0.0 miles
SIS
SIS
MTP ID
PG114
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PDE DIS $0 $0 $0 $600,000 $6,000,000 $6,600,000
PLN DIS $0 $300,000 $0 $0 $0 $300,000
Total $0 $300,000 $0 $600,000 $6,000,000 $6,900,000

Total Project Cost: $6,900,000 (incl. prior + future years)

Intermodal

FM# 4552731 — PORT EVERGLADES SEAPORT - NEW BULKHEAD AT BERTHS 14 & 15

Type of Work
SEAPORT CAPACITY PROJECT
Length
0.0 miles
SIS
SIS
MTP ID
PG114
Lead Agency
Responsible Agency Not Available
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP LF $0 $0 $0 $0 $2,500,000 $2,500,000
CAP GMR $0 $0 $0 $0 $10,000,000 $10,000,000
Total $0 $0 $0 $0 $12,500,000 $12,500,000

Total Project Cost: $12,500,000 (incl. prior + future years)

Transportation Planning

FM# 4393245 — BROWARD MPO FY 2024/2025-2025/2026 UPWP

Type of Work
TRANSPORTATION PLANNING
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY BROWARD MPO

2024 MPO PRIORITY #1

Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PLN PL $4,671,023 $0 $0 $0 $0 $4,671,023
PLN SU $8,650,000 $0 $0 $0 $0 $8,650,000
FLOAT SU $634,407 $0 $0 $0 $0 $634,407
Total $13,955,430 $0 $0 $0 $0 $13,955,430

Total Project Cost: $28,159,983 (incl. prior + future years)

FM# 4393246 — BROWARD MPO FY 2026/2027-2027/2028 UPWP

Type of Work
TRANSPORTATION PLANNING
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY BROWARD MPO

2024 MPO PRIORITY #1

Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PLN PL $0 $3,613,266 $3,613,266 $0 $0 $7,226,532
PLN SU $0 $8,500,000 $9,000,000 $0 $0 $17,500,000
Total $0 $12,113,266 $12,613,266 $0 $0 $24,726,532

Total Project Cost: $24,726,532 (incl. prior + future years)

FM# 4393247 — BROWARD MPO FY 2028/2029-2029/2030 UPWP

Type of Work
TRANSPORTATION PLANNING
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY BROWARD MPO
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PLN PL $0 $0 $0 $3,613,266 $3,613,266 $7,226,532
PLN SU $0 $0 $0 $9,000,000 $9,500,000 $18,500,000
Total $0 $0 $0 $12,613,266 $13,113,266 $25,726,532

Total Project Cost: $25,726,532 (incl. prior + future years)

Miscellaneous

FM# 4542791 — BROWARD BLVD TRUCK PARKING EXPANSION BROWARD BLVD AT I-95

Type of Work
PARKING FACILITY
Length
1.893 miles
SIS
SIS
MTP ID
PG270
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DIH $0 $0 $0 $74,062 $0 $74,062
CST DSBD $0 $0 $0 $1,851,567 $0 $1,851,567
CST ACFP $0 $0 $0 $10,904,400 $0 $10,904,400
PE DSBD $0 $5,000 $0 $0 $0 $5,000
PE ACFP $0 $1,000,640 $0 $0 $0 $1,000,640
Total $0 $1,005,640 $0 $12,830,029 $0 $13,835,669

Total Project Cost: $13,835,669 (incl. prior + future years)

FM# 4337343 — BROWARD OPERATIONS CONTINUING CEI CONSULTANT INSPECTION SUPPORT

Type of Work
INSPECT CONSTRUCTION PROJS.
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $200,000 $0 $0 $0 $0 $200,000
Total $200,000 $0 $0 $0 $0 $200,000

Total Project Cost: $615,313 (incl. prior + future years)

FM# 4337344 — BROWARD OPERATIONS CONTINUING CEI CONSULTANT INSPECTION SUPPORT

Type of Work
INSPECT CONSTRUCTION PROJS.
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $0 $200,000 $0 $0 $0 $200,000
CST DS $0 $0 $200,000 $100,000 $200,000 $500,000
Total $0 $200,000 $200,000 $100,000 $200,000 $700,000

Total Project Cost: $700,000 (incl. prior + future years)

FM# 4337345 — BROWARD OPERATIONS CONTINUING CEI CONSULTANT INSPECTION SUPPORT

Type of Work
INSPECT CONSTRUCTION PROJS.
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $0 $0 $0 $100,000 $0 $100,000
CST DS $0 $0 $0 $0 $200,000 $200,000
Total $0 $0 $0 $100,000 $200,000 $300,000

Total Project Cost: $300,000 (incl. prior + future years)

FM# 4292535 — BROWARD OPS CEI GENERAL CEI CONSULTANT CONSTRUCTION SUPPORT

Type of Work
INSPECT CONSTRUCTION PROJS.
Length
0.0 miles
SIS
Non-SIS
MTP ID
TI271
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DS $150,000 $0 $0 $0 $0 $150,000
Total $150,000 $0 $0 $0 $0 $150,000

Total Project Cost: $1,155,631 (incl. prior + future years)

FM# 4292539 — BROWARD OPS CEI GENERAL CEI CONSULTANT CONSTRUCTION SUPPORT

Type of Work
INSPECT CONSTRUCTION PROJS.
Length
0.0 miles
SIS
Non-SIS
MTP ID
TI220
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $0 $0 $200,000 $0 $0 $200,000
CST DS $0 $0 $0 $200,000 $200,000 $400,000
Total $0 $0 $200,000 $200,000 $200,000 $600,000

Total Project Cost: $600,000 (incl. prior + future years)

FM# 4292536 — BROWARD OPS GENERAL CEI CONSULTANT CONSTRUCTION SUPPORT

Type of Work
INSPECT CONSTRUCTION PROJS.
Length
0.0 miles
SIS
Non-SIS
MTP ID
TI218
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $200,000 $0 $0 $0 $0 $200,000
CST DS $0 $200,000 $200,000 $0 $0 $400,000
Total $200,000 $200,000 $200,000 $0 $0 $600,000

Total Project Cost: $805,000 (incl. prior + future years)

FM# 4292537 — BROWARD OPS GENERAL CEI CONSULTANT CONSTRUCTION SUPPORT

Type of Work
INSPECT CONSTRUCTION PROJS.
Length
0.0 miles
SIS
Non-SIS
MTP ID
TI219
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CST DDR $200,000 $0 $0 $0 $0 $200,000
CST DS $0 $200,000 $200,000 $0 $0 $400,000
Total $200,000 $200,000 $200,000 $0 $0 $600,000

Total Project Cost: $805,000 (incl. prior + future years)

FM# 4296504 — CONTINUING SERVICES FOR SAFETY STUDIES AND ROAD SAFETY AUDITS

Type of Work
SAFETY PROJECT
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY FDOT

NPV= N/A SHSP=SFA1, SFA2, SFA3 B/C=N/A

Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE DIH $10,000 $10,000 $10,000 $0 $0 $30,000
PE DS $850,000 $650,000 $650,000 $0 $0 $2,150,000
Total $860,000 $660,000 $660,000 $0 $0 $2,180,000

Total Project Cost: $4,050,249 (incl. prior + future years)

FM# 4155297 — CONTINUING SERVICES FOR TMS&O ITS SERVICES

Type of Work
ITS SURVEILLANCE SYSTEM
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE DS $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000
Total $300,000 $300,000 $300,000 $300,000 $300,000 $1,500,000

Total Project Cost: $1,500,000 (incl. prior + future years)

FM# 4480581 — CONTINUING SERVICES SAFETY REVIEW AND STUDIES

Type of Work
TRAFFIC ENGINEERING STUDY
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY FDOT

SFA1= SAFETY - PROPER TRAVEL LANES B/C RATIO= N/A NPV=N/A SFA2= INTERSECTION SAFETY SFA3= ACCESS MNGMT & CNFLCT PNT CNTL

Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE DIH $15,000 $15,000 $15,000 $15,000 $0 $60,000
PE DS $500,000 $500,000 $500,000 $500,000 $0 $2,000,000
Total $515,000 $515,000 $515,000 $515,000 $0 $2,060,000

Total Project Cost: $3,001,000 (incl. prior + future years)

FM# 4480591 — D/W SAFETY REVIEWS & STUDIES

Type of Work
TRAFFIC ENGINEERING STUDY
Length
0.0 miles
SIS
Non-SIS
MTP ID
TI400
Lead Agency
MANAGED BY FDOT

SFA1= SAFETY - PROPER TRAVEL LANES B/C RATIO= N/A NPV=N/A SFA2= INTERSECTION SAFETY SFA3= ACCESS MNGMT & CNFLCT PNT CNTL

Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE DDR $300,000 $300,000 $300,000 $200,000 $200,000 $1,300,000
PE DIH $10,000 $10,000 $10,000 $10,000 $10,000 $50,000
PE DS $0 $0 $0 $100,000 $0 $100,000
Total $310,000 $310,000 $310,000 $310,000 $210,000 $1,450,000

Total Project Cost: $1,450,000 (incl. prior + future years)

FM# 2281041 — DISTRICT WIDE/COMMUNITY SAFETY PROGRAM/SECTION 402

Type of Work
SAFETY PROJECT
Length
0.0 miles
SIS
Non-SIS
MTP ID
TI435
Lead Agency
MANAGED BY FDOT

INCOMING GRANT THIS GRANT IS AN OPERATING BUDGET CAT. FOR PH31 DIH & NHTS REIMBURSEMENT UNDER 0110251,99000-3513 FOR NHTS. SEQ-03 = PURCHASE PROMOTIONAL MATERIAL

Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
PE DIH $50,000 $50,000 $50,000 $0 $50,000 $200,000
Total $50,000 $50,000 $50,000 $0 $50,000 $200,000

Total Project Cost: $1,917,355 (incl. prior + future years)

FM# 4363763 — DISTRICTWIDE TRAFFIC OPERATIONS SAFETY REVIEWS AND STUDIES

Type of Work
TRAFFIC ENGINEERING STUDY
Length
0.0 miles
SIS
Non-SIS
MTP ID
PG112
Lead Agency
MANAGED BY FDOT
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029

(Table truncated — see next section for additional projects.)

Aviation Projects

FM# 4547801 — FORT LAUDERDALE EXECUTIVE AIRPORT CONSTRUCT RUNWAY 9 PARALELL TAXIWAY

Type of Work
AVIATION PRESERVATION PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DDR $1,114,500 $0 $0 $0 $0 $1,114,500
CAP DPTO $1,885,500 $0 $0 $0 $0 $1,885,500
CAP LF $750,000 $0 $0 $0 $0 $750,000
Total $3,750,000 $0 $0 $0 $0 $3,750,000

Total Project Cost: $6,108,100 (incl. prior + future years)

FM# 4515931 — FORT LAUDERDALE EXECUTIVE AIRPORT-WESTERN EXTENSION & PARALLEL TAXIWAY

Type of Work
AVIATION CAPACITY PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $389,880 $0 $0 $0 $0 $389,880
CAP FAA $7,017,840 $0 $0 $0 $0 $7,017,840
CAP LF $389,880 $0 $0 $0 $0 $389,880
Total $7,797,600 $0 $0 $0 $0 $7,797,600

Total Project Cost: $7,797,600 (incl. prior + future years)

FM# 4448441 — FORT LAUDERDALE/HOLLYWOOD INT'L AIRPORT AUTOMATED PEOPLE MOVER

Type of Work
AVIATION CAPACITY PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG266
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DDR $0 $1,259,960 $1,489,991 $0 $0 $2,749,951
CAP DPTO $2,711,849 $263,978 $0 $1,538,243 $0 $4,514,070
CAP LF $16,468,824 $15,123,938 $20,262,274 $16,538,243 $0 $68,393,279
CAP DIS $9,175,000 $0 $5,272,283 $0 $0 $14,447,283
CAP GMR $2,225,000 $13,600,000 $13,500,000 $15,000,000 $0 $44,325,000
Total $30,580,673 $30,247,876 $40,524,548 $33,076,486 $0 $134,429,583

Total Project Cost: $328,218,561 (incl. prior + future years)

FM# 4495991 — FORT LAUDERDALE/HOLLYWOOD INTERNATIONAL AIRPORT OPERATIONS FACILITY

Type of Work
AVIATION REVENUE/OPERATIONAL
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $0 $150,000 $0 $0 $0 $150,000
CAP LF $0 $150,000 $0 $0 $0 $150,000
Total $0 $300,000 $0 $0 $0 $300,000

Total Project Cost: $300,000 (incl. prior + future years)

FM# 4548501 — FT LAUDERDALE EXECUTIVE AIRPORT - MASTER PLAN UPDATE

Type of Work
AVIATION PRESERVATION PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $0 $280,000 $0 $0 $0 $280,000
CAP LF $0 $70,000 $0 $0 $0 $70,000
Total $0 $350,000 $0 $0 $0 $350,000

Total Project Cost: $350,000 (incl. prior + future years)

FM# 4533721 — FT LAUDERDALE EXECUTIVE AIRPORT - RUNWAY 13-31 PAVEMENT REHABILITATION

Type of Work
AVIATION PRESERVATION PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $0 $0 $336,000 $0 $0 $336,000
CAP LF $0 $0 $84,000 $0 $0 $84,000
Total $0 $0 $420,000 $0 $0 $420,000

Total Project Cost: $420,000 (incl. prior + future years)

FM# 4533731 — FT LAUDERDALE/HOLLYWOOD INT'L AIRPORT - CONSOLIDATED BCAD OPERATIONS

Type of Work
AVIATION REVENUE/OPERATIONAL
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $0 $0 $500,000 $0 $0 $500,000
CAP LF $0 $0 $500,000 $0 $0 $500,000
Total $0 $0 $1,000,000 $0 $0 $1,000,000

Total Project Cost: $1,000,000 (incl. prior + future years)

FM# 4515731 — FT. LA/HOLLYWOOD INT'L AIRPORT AIRFIELD ELECTRICAL VAULT (DESIGN)

Type of Work
AVIATION REVENUE/OPERATIONAL
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $275,000 $0 $0 $0 $0 $275,000
CAP LF $275,000 $0 $0 $0 $0 $275,000
Total $550,000 $0 $0 $0 $0 $550,000

Total Project Cost: $550,000 (incl. prior + future years)

FM# 4550051 — NORTH PERRY AIRPORT - PHASE I - WASTE WATER IMPROVEMENTS CONSTRUCTION

Type of Work
AVIATION REVENUE/OPERATIONAL
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DDR $0 $0 $4,800,000 $0 $0 $4,800,000
CAP LF $0 $0 $1,200,000 $0 $0 $1,200,000
Total $0 $0 $6,000,000 $0 $0 $6,000,000

Total Project Cost: $6,000,000 (incl. prior + future years)

FM# 4548151 — NORTH PERRY AIRPORT - TAXIWAY P PAVEMENT REHABILITATON

Type of Work
AVIATION PRESERVATION PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $20,000 $0 $0 $0 $0 $20,000
CAP FAA $360,000 $0 $0 $0 $0 $360,000
CAP LF $20,000 $0 $0 $0 $0 $20,000
Total $400,000 $0 $0 $0 $0 $400,000

Total Project Cost: $400,000 (incl. prior + future years)

FM# 4515751 — NORTH PERRY AIRPORT - PHASE II- RUNWAY 10R-28L REHABILITATION

Type of Work
AVIATION PRESERVATION PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $181,750 $0 $0 $0 $0 $181,750
CAP FAA $3,271,500 $0 $0 $0 $0 $3,271,500
CAP LF $181,750 $0 $0 $0 $0 $181,750
Total $3,635,000 $0 $0 $0 $0 $3,635,000

Total Project Cost: $3,635,000 (incl. prior + future years)

FM# 4496271 — NORTH PERRY AIRPORT ADMIN AND MAINT FACILITY EXPANSION CONSTRUCTION

Type of Work
AVIATION REVENUE/OPERATIONAL
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $2,720,000 $0 $0 $0 $0 $2,720,000
CAP LF $680,000 $0 $0 $0 $0 $680,000
Total $3,400,000 $0 $0 $0 $0 $3,400,000

Total Project Cost: $3,400,000 (incl. prior + future years)

FM# 4496061 — NORTH PERRY AIRPORT ATC TOWER REPLACEMENT (CONSTRUCTION)

Type of Work
AVIATION SAFETY PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $311,475 $0 $0 $0 $0 $311,475
CAP FAA $5,606,550 $0 $0 $0 $0 $5,606,550
CAP LF $311,475 $0 $0 $0 $0 $311,475
Total $6,229,500 $0 $0 $0 $0 $6,229,500

Total Project Cost: $6,229,500 (incl. prior + future years)

FM# 4496321 — NORTH PERRY AIRPORT PERIMETER PATH (CONSTRUCTION)

Type of Work
AVIATION PRESERVATION PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DDR $0 $3,912,400 $0 $0 $0 $3,912,400
CAP LF $0 $978,100 $0 $0 $0 $978,100
Total $0 $4,890,500 $0 $0 $0 $4,890,500

Total Project Cost: $4,890,500 (incl. prior + future years)

FM# 4548981 — NORTH PERRY AIRPORT RUNWAY 1R-19L & TAXIWAY E LIGHTING IMPROVEMENTS

Type of Work
AVIATION PRESERVATION PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $0 $0 $0 $2,640,000 $0 $2,640,000
CAP LF $0 $0 $0 $660,000 $0 $660,000
Total $0 $0 $0 $3,300,000 $0 $3,300,000

Total Project Cost: $3,300,000 (incl. prior + future years)

FM# 4548511 — NORTH PERRY AIRPORT WAST WATER IMPROVEMENTS DESIGN

Type of Work
AVIATION REVENUE/OPERATIONAL
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $0 $400,000 $0 $0 $0 $400,000
CAP LF $0 $100,000 $0 $0 $0 $100,000
Total $0 $500,000 $0 $0 $0 $500,000

Total Project Cost: $500,000 (incl. prior + future years)

FM# 4515481 — POMPANO AIRPARK - DESIGN TAXIWAY L REHAB AND RELOCATE CONNECTORS

Type of Work
AVIATION PRESERVATION PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $600,000 $0 $0 $0 $0 $600,000
CAP LF $150,000 $0 $0 $0 $0 $150,000
Total $750,000 $0 $0 $0 $0 $750,000

Total Project Cost: $750,000 (incl. prior + future years)

FM# 4548171 — POMPANO AIRPARK - DESIGN WILDLIFE HAZARD MITIGATION

Type of Work
AVIATION ENVIRONMENTAL PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $160,000 $0 $0 $0 $0 $160,000
CAP LF $40,000 $0 $0 $0 $0 $40,000
Total $200,000 $0 $0 $0 $0 $200,000

Total Project Cost: $200,000 (incl. prior + future years)

FM# 4515491 — POMPANO AIRPARK - RUNWAY 6-24 REHABILITATION WITH MARKING CONSTRUCTION

Type of Work
AVIATION PRESERVATION PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $0 $480,000 $0 $0 $0 $480,000
CAP FAA $0 $864,000 $0 $0 $0 $864,000
CAP LF $0 $480,000 $0 $0 $0 $480,000
Total $0 $1,824,000 $0 $0 $0 $1,824,000

Total Project Cost: $1,824,000 (incl. prior + future years)

FM# 4548521 — POMPANO AIRPARK -AIRSPACE OBSTRUCTION MITIGATION - DESIGN

Type of Work
AVIATION SAFETY PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $0 $14,400 $0 $0 $0 $14,400
CAP FAA $0 $259,200 $0 $0 $0 $259,200
CAP LF $0 $14,400 $0 $0 $0 $14,400
Total $0 $288,000 $0 $0 $0 $288,000

Total Project Cost: $288,000 (incl. prior + future years)

FM# 4550121 — POMPANO AIRPARK -MASTER STORMWATER MANAGEMENT PLAN UPDATE

Type of Work
AVIATION CAPACITY PROJECT
Length
0.0 miles
Lead Agency
Responsible Agency Not Available
MTP ID
PG114
SIS
Non-SIS
Funding by phase, fund source, and fiscal year
Phase Fund Source FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Total
CAP DPTO $0 $25,000 $0 $0 $0 $25,000
CAP FAA $0 $450,000 $0 $0 $0 $450,000
CAP LF $0 $25,000 $0 $0 This markdown input contains general information about the TIP process and public participation, but does not contain any actual project data with FM numbers, funding tables, or specific transportation projects. The content consists of: 1. FAQ-style information about TIP amendments and importance 2. Public participation information 3. Spanish translations of the same information 4. Public meeting notices 5. A thank you page Since there are no actual transportation projects with FM numbers, funding phases, or budget tables in this input, there is no project data to convert into the requested HTML table format. If you have additional input that contains the actual project tables with FM numbers, funding phases (CST, PE, ROW), fund source codes (DDR, DIH, SU, TALU), and fiscal year budget columns, please provide that content and I'll convert it into the accessible HTML format you specified.